← Moore County contracts and bids
Influent Pump Station Upgrade Project
| Contract | Influent Pump Station Upgrade Project |
|---|---|
| Status | Completed |
| Bids due | 2023-10-23 |
| Scope of work |
RE-ADVERTISEMENT FOR BID COUNTY OF MOORE IFB 2024-02 - INFLUENT PUMP STATION UPGRADE Sealed Bids will be received by the County of Moore (OWNER) on the 2nd Floor of the Moore County Historic Courthouse, 1 Courthouse Square, Carthage, NC until 4:00 p.m., Monday, October 23rd, 2023, for the “IFB 2024-02 - Influent Pump Station Upgrade, Water Pollution Control Plant”, Project. Due to an insufficient number of responses at the original bid opening, this project is being re-bid/re-advertised. The work consists of the replacement of four (4) dry pit raw sewage pumps, and the construction of a new electrical building, panelboard, Variable Frequency Drives with Solid State Reduced Voltage bypass, Closed-Circuit Television system, site work, etc. at the Moore Co. Water Pollution Control Plant located at 1094 Addor Road, Aberdeen, NC. At said place and time, and promptly thereafter, all Bids that have been duly received will be publicly opened and read aloud. All Bids must be in accordance with the Bid Documents on file with Moore County, and at the office of Sturgill Engineering, P.A., 1 South Main Street, Lexington, NC 27292. A copy of the Bid Documents may be obtained from the Engineers at the address stipulated above upon payment of $150.00 for each complete set of documents. Plan costs are non-refundable. Bidders must be licensed contractors in the State of North Carolina for the type of work required. Bids will be received on a unit price or lump sum basis as described in the Contract Documents. The work is to commence within 15 days after the Date of Contract. Completion of the work is as required in the contract documents. The successful Bidder will be required to furnish a Construction Performance Bond and a Construction Payment Bond as security for the faithful performance and the payment of all bills and obligations arising from the performance of the Contract. Bid security in the amount of 5 percent of the total Bid must accompany each Bid. No Bid may be withdrawn within a period of 60 days after the date fixed for opening Bids. The Owner reserves the right to select alternatives, to reject any or all Bids, to waive informalities, and to reject nonconforming, nonresponsive, or conditional Bids. Moore County Public Utilities is an Equal Opportunity Employer. Small businesses, minority owned businesses, women owned businesses, and businesses owned by low and moderate-income persons are encouraged to bid. Terra Vuncannon Purchasing Manager Sturgill Engineering, P.A. Lexington, NC |
| Category | Moore County General Bids |
| Posted | 2023-08-30 |
| Bid posting | Open |
Part of the county's open data: download every contract (CSV).